LED tunnel light 120W led flood light with bridgelux and mean well IES files and Dialux simulation - TLD-SD600-120W

160 watt led flood light, 1.Bridgelux / Epistar Chip , high lumen, 2.3 years warranty, 3.CE RoHS SAA TUV EMC C-Tick, 4.IP65 - details see: https://www.lightinghere.com/led-tunnel-light-120w-led-flood-light-with-bridgelux-and-mean-well-ies-files-and-dialux-simulation-10028420
Item Type: Tunnel LightsLight Source: HIDInput Voltage(V): AC85-265v , DC10-28vLamp Power(W): 120
Lamp Luminous Flux(lm): 13200Lamp Luminous Efficiency(lm/w): 110CRI (Ra>): 80Color Temperature(CCT): Pure White
Working Temperature(℃): -40 - 55Working Lifetime(Hour): 50000Lamp Body Material: AluminumIP Rating: IP65
Certification: CE,C-tick,EMC,RoHS,SAAPlace of Origin: Guangdong China (Mainland)Brand Name: TLDModel Number: TLD-SD600-120W
size: L600*W285*H200 MMcolor: white, green , blue, red, RGB, amberColor of lamp housing: black , silver gray , white optionalwarranty: 3 years
material: high purity aluminum die casting housing + Bridgelux/Epistar led chipdriver: Meanwell driverpower factor( PF): >0.98driver efficiency: >90
beam angle: 120°   
LED tunnel light 120W led flood light with bridgelux and mean well IES files and Dialux simulation
contact supplier for LED tunnel light 120W led flood light with bridgelux and mean well IES files and Dialux simulation


[Good Quality] 100w led tunnel light 100 watt tunnel light

TLD-SD600-120W

Application :

Highway tunnel , underground passage, railway , underfroup parking , sattion , landscape , archetecture lighting and other indoor& outdoor lighting .

Certificate : CE ROHS EMC SAA TUV C-TICK

Our Services:

1. Any inquiry or question from you will be replied in 24hrs during working day.

2. Warranty: 36months, WE provide free accessories as maintenance within the warranty period.

3. Every unit will be aging for 48 hours in order to ensure the high quality.

4. Delivery time: Within one week for samples, within one month for bulk orders.

5. Delivery methods: By air express (DHL, UPS, TNT, FedEx, EMS), air cargo and sea.

Trading term:

1. T/T 100% , OR 30% T/T By advance , 70% balance be settled before shippment .

2. Western union

3. Mass products can settle payment with L/C

Delivery time :

Sample (less than 10 pieces) : 3-5 working days

10-50 pieces: 5-7 working days

50-100 pieces : 7-10 working days

100-200 pieces : 10-15 working days

> 200 pieces : we need negotiation according to actual production plan

Product Display

Factory:

More information:

pls contact me with no hesitate , then I will send specification,installment and do more best service for you, thank you!

Different material, different price, we can produce according to your require.

Shenzhen Tenglongda Optoelectronics Co.,Ltd

Packaging Detail:one pcs per inner box
Delivery Detail:3-4 days for example , 10 days for mass order

Related Product for LED tunnel light 120W led flood light with bridgelux and mean well IES files and Dialux simulation