high power factor high lumens induction tunnel lighting - FN-SD01
Item Type: Tunnel Lights | Light Source: Induction Lamps | Input Voltage(V): 110V 220V 277V | Lamp Power(W): 150 |
Lamp Luminous Flux(lm): 9750 | Lamp Luminous Efficiency(lm/w): 65 | CRI (Ra>): 80 | Color Temperature(CCT): 2700K-6500K |
Working Temperature(℃): -30 - +50 | Working Lifetime(Hour): 60000 | Lamp Body Material: Aluminum | IP Rating: IP65 |
Certification: CCC,CE,CQC,EMC,LVD,RoHS,UL | Place of Origin: Jiangsu China (Mainland) | Model Number: FN-SD01 | Power: 85W~165W |
Finishing Color: Black | Application: tunnel |
Materials and features:
1. According backlighting lighting design and manufacture of a new tunnel for lamps, can provide the best lighting effects.
2. Lights of aluminum, high quality steel casing, external paint, good corrosion resistance.
3. High aluminum reflectors, and the optical system of symmetric and asymmetric type two.
4. Principle by backlighting or installed at the top of the tunnel by lighting the traditional way of lateral installed.
Applicable place:
Tunnel aisle, ports, Square area, and the Treasury underground lighting etc.(mounting height is suggested to be 6 meters and above)
Applicable light source:
FN-85W~165W
Characteristics of FuNeng Induction Lamp:
1. System Lumen Efficiency : 68-73 lm/w
2. Color Rendering Index : ≥ 80
3. Color Temperature : 2700K~6500K
4. Starttime : ≤ 0.5 seconds
5. 20000h Lumen Maintenance : ≥ 80%
6. Operation Frequency : 2.65MHz
7. Power Factor : > 0.98
8. Environment Temperature : -30°C~+50°C
9. Ultra - Long life up to 60,000 hours
10. Energy Saving : save up to 40 % compared to metal halides, 5 times more efficient than incandescent light bulbs, and up to twice as efficient as compact fluorescent lights
11. Low energy consumption
12. Flicker - free start, ideal for areas with high switching frequency
13. High light efficacy, great Color Rendering Index
14. 3 years warranty
Dimension Figure
MATCHED ELECTRODELESS LAMP
CERTIFICATES
APPLICATION CASE
FuNeng Workshop
Packaging Detail:Carton CaseMarerial : Double-wall corrugated paper |
Delivery Detail:7 workdays after payment confirmed |