GT-203 Induction Lamp for Tunnel Light IP65 WF2 - GE-203
We manufacture explosion proof :, 1) ISO9001:2008 certificated;, 2) over 15-year experience;, 3) various installation for opt - details see: https://www.lightinghere.com/gt-203-induction-lamp-for-tunnel-light-ip65-wf2-10028386
Item Type: Tunnel Lights | Light Source: HID | Input Voltage(V): AC220V/50HZ | Lamp Power(W): 150 |
Color Temperature(CCT): Cool White | Working Lifetime(Hour): 60000 | Lamp Body Material: Aluminum Alloy | IP Rating: IP65 |
Certification: CCC | Place of Origin: Shanghai China (Mainland) | Brand Name: BAOLINEX | Model Number: GE-203 |
GT-203Induction Lamp for Tunnel Light IP65 WF2
Technical Parameter:
Applied range | Various railway tunnel,highway tunnel,subway,light rail and other places of lighting |
Application | Indoor,outdoor |
Enclsure | Does not contain copper aluminum alloy extrusion,surfae anode oxidatiion |
Exposed fastener | High quality stainless steel |
Display | Impact-resistant and hermally stable toughened glass |
Component | Lamp holder typed E40,Structure sealing gasket made of acid-resistant silicon rubber |
Structure description | Silicone rubber gaskets structure design with strong protection |
Degree of protection | IP65 |
Rated voltage | AC220V/50Hz |
Light source power | 70W-150W,50W |
Corrosion-proof | WF2 |
Thread of inlet | G3/4" |
Cable diameter | Ø10mm~Ø14mm |
Light source | MH,HPS,ED |
Overall Dimension:
About Us
Wenzhou Baolin Technology Company, the production base of which located in Baoshan District of Shanghai, China, covering an area of 70,000 square meters, is a leading manufacturer of professional explosion proof electrical equipment mainly directed to the industrial, petrochemical, oil & gas, aerospace industries etc. In addition, the company produces special portable lighting, waterproof and dust-proof light fittings and apparatus. The products are more than 100 series and 1,000 items with various specifications.
Packaging Detail:Package in carton with good inner supporting package with polyethylene bubble; 1pcs/ctn independent packing; wooden packing if necessary |
Delivery Detail:30 days after payment |