4 copper heatpipes LED street lighting heat sink - LED-019
Type: Heat Sinks | Surface Treatment: Nickel | Warranty(Year): 1 | Process: Zippered Fin and Copper heatpipes |
Certification: RoHS,UL | Place of Origin: Guangdong China (Mainland) | Brand Name: DEEPCOOL | Model Number: LED-019 |
Body Color: Silver | Shape: Square | Body Material: Aluminum | Acceptable: OEM/ODM |
4 Heatpipes Aluminum Fin Heat sink used for LED Street Lighting
Advantages:
1. Competitive price,best performance
2. Samples are available
3. Customized designs are accepted
4. CNC machining are approved
5. ISO 9001:2000, ISO 14001:2004 Certificate
Description | Aluminum LED Heatsink( 275.1x180x94mm ) |
Application | Heat dissipation |
Material | Aluminum 6000 series, coper |
Hardness | 8-12HW |
Heat treatment | T3-T8 |
Surface Treatment | Clear anodizing, Black anodizing,powder coating,brushing; sand blasting; shot blasting;polishing |
Customized designs | Yes, we can. |
Deep process | Cutting, milling, drilling, punching, CNC ect |
Free Samples | Yes, we can. |
Packing | Carton, wooden pallet or by your request. |
Payment | T/T, L/C |
Logistics | Shenzhen port, China |
Shipment Time | 4 weeks after confirmed PI |
Alloy chemical element profile
Aluminium alloy composition profile | ||||||
Alloy | Si | Mg | Fe | Cu | Mn | Zn |
6063 | 0.2-0.6 | 045-0.9 | <0.35 | <0.1 | <0.1 | <0.1 |
6061 | 0.4-0.8 | 0.8-1.2 | <0.7 | 0.15-0.4 | 0.15 | 0.25 |
6063B | 0.2-0.6 | 045-0.9 | <0.35 | <0.1 | <0.1 | <0.1 |
6060 | 0.3-0.6 | 0.35-0.6 | 0.1 | 0.1 | <0.1 | 0.15 |
6005 | 0.6-0.9 | 0.4-0.6 | 0.35 | 0.1 | 0.1 | <0.1 |
6N01 | 0.4-0.9 | 0.4-0.8 | <0.35 | <0.35 | <0.5 | <0.25 |
Material | Aluminum 6000 series, coper | |||||
Application | Heat dissipation | |||||
production processing | make mould -casting for aluminium ingot-extrusion -treatment for hardness resistance-aluminium finish machining -surface treatment-package | |||||
Machining category | cutting-drilling-punching-tapping-angle of chamfer-cnc | |||||
surface treament category | milling-polish-anodise(include color for silver, red, champagne, black, blue, bronze and so on)-brush-sandblasting-powdercoated and so on . | |||||
Mould processing | make drawing-confirmed drawing-add material -lathe-drilling-milling-polish-treatment for heat resistance- wire cutting-electrial spark -assemble mould | |||||
Hardness parameter | 1)6063:10-12HW 2)6061:14-16HW | |||||
MOQ | 1000pcs | |||||
Package | wooden pallet with polybag, carton and outside wrap by PE film or packedby your request. | |||||
Delivery time | 4 weeks after confirmed PI | |||||
Term of payment | 1)30% to 50% t/t deposit in advance,blance 50% to 70% paid before goods leave factory or goods before shipment . 2)L/C before the mass production. | |||||
Certifcate | ISO 9001:2000 ISO 14001:2004 , IAF, CNAS, TUVCE, UL and FCC. | |||||
Factory capacity | 1)factory cover area:more than 78,000 square meters 2)Date of found year:1996 3)Employee:More than 500 employee, & more than 10% of them technologists | |||||
Machine capacity | 1)Extrusion line:18 set of 500-3000tons imported extrusion lines, annual output capacity is more than 30,000 tons. 2)Machining equipment:18 production line .15 sets of imported CNC lathe,80sets of punching,drilling,tapping machines,with more than 36,000 product apply in electronic ,building,machinery,automobile,camera monitor etc . 3)Advance test equipment and lab :spectrometric analyzer, metallurgical analyzer, imported projector measuring instrument, Rockwell hardness meter, clamp type hardness meter, desk type hardness meter, eddy-current film tester, colorimeter, electron microscope and so on | |||||
Main Market & Projects | Our main market is foucs on America, Japan, EU, Africa, Singapore, Hong kong, Taiwan, South Asia and so on. |
Shipment:
1.FOB Shenzhen or HongKong for mass production.
2.DHL,UPS,FEDEX,TNT or any other international express for sample or small quantity.
Anyway,the more details can be discussed.
Payment:
We can accept thePayment T/T and L/C.
The payment for thehigh value sample will be charged, and will bereturned to youafter confirming the mass production.
The payment for thelow value sample is free, but the freight should be covered by you.
Shipping:
The sample will be shipped by express, like FEDEX, DHL, UPS and EMS. And the freight should be paid by clients.
The mass goods will be shipped by air for any emergency, the freight will deal with you for the concrete condition.
Usually, the products will be shipped by sea.
Delivery Time:
4 weeks after confirming the PI
Our factory:
Inspection facilities:
The certificate:
Our company:
Our company was founded with the mission of "providing the best performance & humanized thermal solutions for worldwide customers".
We design and manufacture a comprehensive range of high-quality products, covering desktop cooling solutions, laptop cooling solutions, server cooling solutions, embedded cooling solutions and other thermal components.
The goal of our company is "to maintain customer satisfaction by serving our customer's ever-changing thermal needs and providing the quickest and most comprehensive service available", and we sincerely hope to establish the business relation with you.
Looking forward to be on service of you!
Shenzhen DEEPCOOL Industries Co., Ltd.(Plant)
www.deepcooltech.com
Tel.: +86-010-56401736/1739
Fax: +86-010-56401942
Packaging Detail:According to buyer's advice |
Delivery Detail:4 weeks after confirmed the PI |