COB PAR 64 RGBA wih 200w RGBA 4 in COB high MCD LED - LED par 64
Light Source: LED | LED Light Source: LED | Input Voltage(V): AC 90-240V 50/60Hz | Lamp Power(W): 230 |
Color Temperature(CCT): Other | Working Temperature(℃): 0 - 45 | Working Lifetime(Hour): 100000 | IP Rating: IP33 |
Certification: CE,RoHS | Place of Origin: Guangdong China (Mainland) | Brand Name: Topstriving | Model Number: LED par 64 |
Emitting Color: RGB+Amber | Voltage: AC 90-240V 50/60Hz | Power Consumption: 200w RGBA 4 in COB high MCD LED | Operational Modes: DMX 512 protocol, Sound Active, Auto, master/slave |
Beam Angle: 40°degrees | DMX Channels: 4/6/9CH | Field angle: 80 degree | Color: RGBA |
Life: 100,000h | Dimension: 50*23*21cm | Weight: 4.45kg |
COB PAR 64 RGBA with 200w RGBA 4 in 1 COB high MCD LED
1. Features:
Using COB LED(chip on board) to achieve much more brightness and excellent ventilations and lowest energy consumption,
with surface light source function plus the molded sandy finish reflector making light projections evenly distributed
covering more areas,really ideal for BARS, DISCO HALLS, SMALL SHOWS, CABARETS, MUSIC
1.200WRGBA four in one COBhigh MCD LED
2. 4 operational modes: DMX, Master/Slave, Stand Alone & Sound Active
3.8 sub menus with serial numbers for easy operations
4. Fans running speeds adjustable by the programming for less noise
5. Beam angle 40 degrees,field angle 80 degrees
6 4/6/9 DMX channel modes
7. Blue LCD display
8. Du hanging bracket included,3-pin XLR In/Out
9. Shutter: Pulse effect; random strobe slow to fast
10. Power Consumption: 230W max
11. Dimensions (LxWxH):50*23*21cm/hanging brackets placed vertically
12.Weight: 4.45kgs
2. Specifications:
1 | Voltage | AC 90-240V 50/60Hz |
2 | Light source | 200w RGBA 4 in COB high MCD LED |
3 | OperationalModes | DMX 512 protocol, Sound Active, Auto, master/slave |
4 | Beam Angle | 40 degrees |
5 | DMX Channels | 4/6/9CH |
6 | Electronic Dimming | 0-100% |
7 | Dimension | 50*23*21cm |
8 | Weight | 4.45kg |
3.Trade Terms:
1. Payment Terms: By T/T or western union or paypal
2. Delivery time: 40'HQ container within 4 weeks
3. Shipping method: DHL, UPS, FedEX, TNT door to door service, by sea, by air, etc
4. OEM&ODM:accepted.
5. packing:carton packing or fight case optional.
4. Warranty:
Delivery time | about 1 week |
Producing time | 15 -20 days |
OEM or ODM service | accept |
Payment | T/T,paypal,Western Union |
Warranty time | Full 2 year |
5.Pictures:
Packaging Detail:Carton packing |
Delivery Detail:3-30days,according to quantity |